Fast, Reliable New Detached ADU Across Rialto
A new detached ADU in Rialto typically runs $185,000-$340,000 all-in, from the first site survey through final inspection, depending on whether you choose a custom stick-built structure or a prefab system like Dvele or Mighty Buildings. We’re Ellery ADU Studio, and our New Detached ADU team designs, permits, and builds under one contract at one written price. Dispatch and scheduling are coordinated from our Inland Empire office, with crews serving Rialto directly. Call (909) 359-6463 to schedule your free estimate.
Why Ellery ADU Studio San Bernardino Is Rialto’s Preferred New Detached ADU Company
We’ve designed, permitted, and built more than 900 ADUs since 2015, the year California’s ADU laws began their rapid shift. Rialto homeowners come to us after they’ve already collected a quote or two that doesn’t match what the city’s building department actually allows.
Our reviews from Rialto customers consistently cite two things: the documented photo record we deliver after every site visit, and the fact that our permit sets pass plan check the first time. That matters in Rialto, where the building department has updated its local ADU ordinance repeatedly to track state preemptions like SB 9 and AB 68. Contractors who work primarily coastal markets still quote setback and unit-size caps that Rialto has already been forced to relax.
Response time to Rialto is same-week for initial site surveys. We know the difference between a 1950s stucco tract near Base Line Road and a 1970s split-level off Riverside Avenue, and we know what each turns up once walls open. Nadia Ellery built this studio on the principle that the permit set is the product, not an afterthought, and that principle governs every Rialto project we take on.
Our New Detached ADU Services in Rialto

Custom Built ADU
Custom built ADUs in Rialto start around $220,000 and run to $340,000+ for larger two-bedroom units with full kitchens and laundry. We specify 2×6 framing, Title 24-compliant insulation, and standing-seam or composition roofing matched to the primary residence. On older Rialto homes, we begin with a pre-permit inspection of the existing electrical and plumbing services, because pre-1978 houses in this city frequently hide aluminum branch wiring and 100-amp panels that must be upgraded before the ADU rough-in will pass. Those findings get written into your contract as line-item allowances before demo begins, per Haven Standard Clause 5.

Prefab ADU Installation
Prefab ADU installation in Rialto typically ranges from $185,000-$280,000, depending on the manufacturer and the site prep required. We specify and coordinate Dvele, Mighty Buildings, and Boxabl systems within our single-contract model, meaning the factory warranty and our installation warranty are managed by one point of contact. Rialto’s wide lots, many running 7,000-10,000+ sq ft in the post-WWII through 1980s tract neighborhoods, accommodate prefab modules that would be impossible on coastal LA parcels. The crane set and utility tie-in are included in our written price.

Modular ADU
Modular ADUs differ from prefab in their construction standard: built to the same IRC codes as site-built homes, not HUD code, and financed on conventional construction loans. In Rialto, modular ADUs run $200,000-$320,000. We coordinate Plant Prefab and other modular systems with the same permit-first approach, ensuring the factory drawings match Rialto’s current setback and height standards before modules ever leave the plant.

Studio ADU
Studio ADUs in Rialto, whether custom or prefab, typically run $185,000-$250,000. These 300-450 sq ft units suit the rental demand from Rialto’s logistics and warehouse corridor along the I-10/I-15 interchange, where distribution-sector workers need affordable housing within commuting distance. We specify a correctly sized ductless mini-split as non-negotiable; Rialto’s summer highs of 105-110°F without coastal marine buffer make undersized HVAC a failure mode we’ve seen too many times.

1-Bed & 2-Bed ADU
One-bedroom detached ADUs in Rialto typically run $210,000-$290,000; two-bedroom units run $260,000-$340,000. The bedroom count drives plumbing, electrical load, and Title 24 calculations, so we lock the scope at signing. On a 1954 wood-frame stucco tract home near the corner of Riverside Avenue and Base Line Road, we found aluminum branch wiring and a 100-amp panel during our pre-permit inspection-both required upgrade to pass the ADU rough-in. We wrote those items into the contract as line-item allowances before demo, then installed a correctly sized ductless mini-split and a whole-unit scale inhibitor because Rialto’s hard water and 105-110°F summer highs will destroy an undersized HVAC or untreated water heater within a season.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Rialto
We specify and coordinate prefab and modular systems from Dvele, Mighty Buildings, Boxabl, and Plant Prefab, among others, within our single-contract design-build model. For Rialto homeowners, this means factory warranties and our installation workmanship warranty are managed through one point of contact, not split between a designer, a general contractor, and a module supplier. We maintain relationships with these manufacturers’ West Coast distribution networks, which reduces lead times for Rialto projects and ensures replacement components are available without cross-country freight delays.
Common New Detached ADU Problems We See in Rialto Homes

- Aluminum branch wiring and undersized panels. Pre-1978 Rialto homes frequently have 100-amp panels and aluminum branch wiring that won’t pass ADU rough-in inspection. We catch this during pre-permit inspection and write the upgrade into the contract as a line-item allowance, not a surprise change order.
- Failed or undersized HVAC. Rialto’s June-September temperatures of 105-110°F destroy undersized ductless mini-splits. We size for peak load, not average load, because an unrentable ADU from June through September is a failed investment.
- Hard water scale damage. The Inland Empire has some of Southern California’s hardest municipal water. Without a whole-unit softener or scale inhibitor, ADU water heaters and fixtures scale up within a year, producing tenant complaints and premature replacement.
- Outdated setback quotes from non-local builders. Rialto’s ADU ordinance has been amended repeatedly to track state preemptions. Out-of-area builders often quote coastal-default setbacks and unit-size caps that Rialto has already been forced to relax, causing plan-check rejections and redesign fees.
Pricing for New Detached ADU in Rialto, CA
Here’s what new detached ADU construction costs in Rialto’s current market:
| ADU Type | Typical Range (All-In) |
|---|---|
| Studio ADU (custom or prefab) | $185,000 - $250,000 |
| 1-Bedroom Custom Built | $210,000 - $290,000 |
| 2-Bedroom Custom Built | $260,000 - $340,000 |
| Prefab ADU Installation | $185,000 - $280,000 |
| Modular ADU | $200,000 - $320,000 |
These ranges include design, permit set, site prep, construction, and final inspection. What moves the number: electrical service upgrade (add $4,000-$8,000 if your panel is undersized), foundation type (slab-on-grade versus raised stem wall), and utility extension distance from the primary residence. Under Haven Standard Clause 1, every project is quoted with a written price before any work begins. We also offer a Free Second Opinion on any written estimate already in your hand. Call (909) 359-6463 for your written quote.
We Also Serve Cities Near Rialto

Our crews build throughout the Inland Empire. If you’re comparing options, we also serve Rialto neighbors in San Bernardino, Fontana, Grand Terrace, and Colton under the same single-contract, written-price model.
Serving Rialto, CA - Our Local Coverage Area
We’re based in the Rialto area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - New Detached ADU in Rialto

Yes, if your home was built before 1978 and still has its original 100-amp panel or aluminum branch wiring, the ADU rough-in inspection will require an upgrade to 200-amp service with copper conductors. We identify this during our pre-permit inspection and write it into your contract as a line-item allowance before demolition starts, so the cost is known, not discovered. Call (909) 359-6463 to schedule your inspection and written quote.
We specify a correctly sized ductless mini-split system rated for Rialto’s peak summer loads, which routinely hit 105-110°F. An undersized unit fails in June and leaves the ADU unrentable through September. We calculate load based on the structure’s square footage, insulation value, and orientation, not a rule-of-thumb. Call (909) 359-6463 to review the HVAC line item in your written estimate.
We specify a whole-unit water softener or scale inhibitor on every Rialto ADU because the municipal water here is among the hardest in Southern California. Without it, scale buildup destroys water heaters and fixtures within the first year, producing tenant complaints and premature replacement costs. The unit is included as a standard line item, not an upgrade. Call (909) 359-6463 for details in your written quote.
Yes. Rialto’s building department has updated its local ADU ordinance multiple times to comply with California’s shifting state preemptions, including AB 68 and SB 9. Out-of-area builders frequently quote coastal-default setbacks and unit-size caps that Rialto has already been forced to relax, which causes plan-check rejections and costly redesigns. We pull the current Rialto standards before we draw. Call (909) 359-6463 to verify your quote against the current ordinance.
On Rialto’s 1950s-1980s wood-frame stucco tract homes, we regularly find galvanized supply lines, aluminum branch wiring, 100-amp panels, and failed or missing waterproofing at slab edges. These are not exceptions; they’re the norm for this housing stock. Our process is inspection first, then written allowances for what we find, then demolition only after you’ve approved the scope and price in writing. No surprise change orders. Call (909) 359-6463 to schedule your pre-permit inspection.
Written by Nadia Ellery, Owner at Ellery ADU Studio, serving Rialto and the Inland Empire since 2015.